Client
University of Warwick
Building Use
Laboratories
Project Duration
14 weeks
Procurement Method
Buy
Why buy from PortakabinProject Features
- Advanced R&D facilities with highly complex M&E services
- Three laboratories with high-performance concrete floors suitable for heavy or highly-sensitive equipment
- 9m-high central processing hall
- Offices
- Open plan research area
-
The Requirements
A state-of-the-art research facility was required for the new International Institute for Nanocomposite Manufacturing at WMG at the University of Warwick – the first institute of its kind in the world. The new institute develops innovative manufacturing technologies enabling industry to make large-scale nanocomposite parts for products in sectors such as telecommunications, electronics, pharmaceuticals, aerospace, automotive, security and medicine. A team of 50 nanocomposite researchers work there with other academic groups and partners from the industry, both in the UK and internationally.
-
The Solution
The two-storey £2.3m scheme was manufactured off site at the Portakabin production centre in York and craned into position as 28 steel-framed modules. Offsite construction reduced the programme time to just 14 weeks on site – months less than originally envisaged. The exterior walls of the building have been arranged to create a dust-free, clean and easy-to-maintain environment for nanocomposite testing. The building houses advanced R&D facilities with highly complex M&E services and extensive use of renewable technologies to reduce energy consumption and carbon emissions. It has three laboratories with factory-installed high-performance concrete floors and full height uPVC hygienic wall linings.
There is a 9m high central processing hall with an in-situ poured concrete floor to support specialist equipment; offices and an open plan research space. The highly sustainable facility benefits from a number of renewable technologies that generate 18.9% of its annual energy requirement. Externally, the scheme has secondary perforated cladding for a high-tech appearance, and a feature mono-pitch roof.
The building has exceeded our expectations. It is as good as any site-based build. Offsite construction suits nanocomposite manufacturing very well and we would definitely recommend it.
A unique promise for your complete peace of mind
Knowing you will meet your targets is a great starting point for any building project
Jericho Primary School
Jericho Primary School
Temporary classrooms installed in eight weeks after storm Eowyn hits
Temporary classrooms installed in eight weeks after storm Eowyn hits
Project Features
- Water and waste connections
- External ramp for access
- Air conditioning throughout
- Groundworks / foundations and pathways
Buckton Fields Primary School
Buckton Fields Primary School
In just four months, 44 temporary buildings were installed to provide high-quality teaching, learning and welfare space for 180 pupils.
In just four months, 44 temporary buildings were installed to provide high-quality teaching, learning and welfare space for 180 pupils.
Project Features
- Radon membrane barrier
- Early year playground with equipment and astroturf
- Air conditioning and access control
- Installation of new soakaway
- Timber-effect vinyl wrap with school logo
- Internal graphics
- Oak-effect vinyl flooring
- New secure line fencing, fire tender road, pedestrian route to entrance and new gates
- Grass area and pathways
Haygrove School
Haygrove School
First of three schools delivered in record-breaking time with spacious classrooms, offices, canteens, science labs and games rooms.
First of three schools delivered in record-breaking time with spacious classrooms, offices, canteens, science labs and games rooms.
Project Features
- Four separate teaching blocks
- Fully fitted science classrooms
- Powered access doors
- Full production kitchen and dining hall
- Science labs
- Games room
- Staff offices and break rooms